£954,907
€1,114,500
2 bed apartment for saleAvenue Girard, Sainte-Maxime, Provence-Alpes-Côte D'azur
2 beds
2 baths
About this property
New build, Off plan, Reversible air conditioning, Shared heated swimming pool, Pool house, Two padel courts, Pétanque court, Fitness trail, 1 private parking space
Garden apartment Sainte-Maxime offers an understated retreat within the civiù development, just 200 metres from the Mediterranean shoreline. This ground-floor residence encompasses 79 m2 of living space complemented by 167 m2 of private outdoor terraces and a garden, where sea views connect directly to the Gulf of Saint-Tropez. The design brings abundant light into the living area, with a natural flow from reception and dining spaces to the garden. Two bedrooms and two contemporary shower rooms provide balance for daily living or seasonal stays.
Thoughtfully arranged with comfort and convenience at the fore, the private outdoor spaces lend a house-like scale while retaining the immediacy of new-build design. Everyday ease is enhanced by a private parking space. Residents of civiù benefit from amenities including a shared heated swimming pool, pool house, two padel courts, pétanque court, and a fitness trail within landscaped grounds. Sainte-Maxime’s shops, port, and year-round attractions are easily accessible.
A first interior-design consultation with Studio Cassy is included, with scope for buyer modifications depending on construction progress. Completion is anticipated in the second half of 2027.
Thoughtfully arranged with comfort and convenience at the fore, the private outdoor spaces lend a house-like scale while retaining the immediacy of new-build design. Everyday ease is enhanced by a private parking space. Residents of civiù benefit from amenities including a shared heated swimming pool, pool house, two padel courts, pétanque court, and a fitness trail within landscaped grounds. Sainte-Maxime’s shops, port, and year-round attractions are easily accessible.
A first interior-design consultation with Studio Cassy is included, with scope for buyer modifications depending on construction progress. Completion is anticipated in the second half of 2027.



.png)